AC Installation Timeline: What to Expect
Planning your air conditioning installation? Here's a realistic timeline from first contact to enjoying cool air.
Step 1: Free Survey (30-60 minutes)
We visit your property to assess your needs, measure rooms, check electrical supply, and determine the best unit placement.
Step 2: Quote (within 24 hours)
You receive a detailed written quote with equipment specifications, installation plan, and total cost.
Step 3: Installation Day
- Single split system: 4-6 hours
- Multi-split (2-3 units): 1 day
- Multi-split (4+ units): 1-2 days
- Ducted system: 2-3 days
- Heat pump/aerothermal: 2-4 days
Step 4: Commissioning & Handover
We test every unit, explain the controls, set up WiFi connectivity, and provide all warranty documentation.